• Weston Project

 
front yard and exterior before after
before after
living room fireplace before after
dining room before after
kitchen from living room kitchen from dining room
hallway before after
bedroom before after
back of house before after
back yard before after
more back yard before after
   
   
| | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | |


 

 • bathroom - Cambridge

              new tile floor, sink and built-in wall cabinets
before               after
   
   
RE-TILING FLOOR - every stage is done to insure a lasting job  
   
   
   
| | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | |


 

 • ceiling restoration

 
after  
   
   
CEILING REPAIR AND RESTORATION -
every stage is done to insure a lasting job
 
   
| | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | |

 

   

 • exterior painting and woodwork

              
before after
| | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | |
   
   

 • mudroom

              
before after
| | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | | ||||| |||||| |||||| | | | | | |    | | | | | | |

                        |  |  |  |  |  |     home      |  |  |  |  |  |      before & after      | |  | | |  |      contact     |  |  |  |  |  |                    

© 08-2010    Level & Plumb Construction    All rights reserved.     A Job Well Done.    web design v van sant.